I was writing this post on a plane to London with my family. Several weeks of preparation for this long-awaited trip reminded me of a planning principle I’ve used for years — and one I’ve watched most teams ignore until a deadline is already at risk.
It’s called backplanning (or backward planning). And once mastered, it becomes one of the most reliable tools for hitting deadlines without the last-minute scramble.
I’ve found it helpful across every context — vacation, work project, product launch, market entry, strategic initiative. Small or large. The principle is the same.
Because backplanning enables three good things to happen:
- Plan out all the necessary and important steps on the way to results
- Achieve desired results on time
- Avoid stress along the way
At the very beginning of the planning process, I am able to see the sequence of events and make sure that enough time is devoted to each step at the right time.
What backplanning is — and why most projects don’t use it
Backplanning is the process of planning backwards: starting from your end result (point B) and working back through all necessary steps to where you are today (point A).

In my case, once the dates for our London trip were set, the questions were:
- What needs to be done before we arrive at the hotel?
- What needs to be done before that — once we land
- What needs to happen before we board?
We keep working backwards until we reach today — and suddenly the entire sequence is visible before we’ve taken a single step.
This is what Dr. Stephen Covey called “start with the end in mind” — before you start, know exactly where you want to end up. Align your steps in light of that end result, and you have a clear path toward the goal.
The principle seems straightforward. Yet every day in my work I see projects that aren’t properly planned this way — leading to missed deadlines, poor quality results, and stress for everyone involved. Teams start from today and plan forward, which means they rarely see the constraints and dependencies until they hit them.
Backplanning surfaces those constraints before they become problems.
Where this matters at leadership level
At scale, this is how every major initiative gets planned — market entry, product launch, digital transformation, organizational restructure. The principle is the same whether you’re organizing a family trip or a €10M program.
The difference between a project that hits its deadline and one that misses it is almost never effort. It’s whether the team had a clear backwards plan from the outcome — or was making it up week by week.
The five steps of backwards planning / backplanning:
Step 1 – Formulate your outcome, your end result
What does done look like? What are the specific, measurable results you need to see at the end of this project? Without a clear outcome, everything that follows is guesswork.
Step 2 – List all necessary steps with time estimates
Make a detailed list of every step required to reach the outcome, with a realistic time estimate for each. This is the step most people underplan — including me on the London trip. I didn’t devote enough time to this step, and we paid for it with stress the day before departure. If we hadn’t done it at all, the trip would have been a mess. The lesson: don’t rush step 2.
Step 3 – Discuss the outcome and steps with everyone involved
Before locking in the plan, align with all parties. Dependencies you didn’t see become visible when the people responsible for each step are in the room. This conversation almost always surfaces something the plan missed.
Step 4 – Put steps on a timeline and prioritize
What goes first? What can’t happen until something else is done? What are the critical dependencies? Map the sequence, identify the constraints, and build the timeline from the outcome backwards to today.
Step 5 – Plan into your calendar, assign responsibility, and execute
Each step goes into the calendar with a named owner and a deadline. Review progress as often as the project requires — daily for fast-moving projects, weekly for longer ones.
One additional note: always build in buffer time. Some steps will take longer than estimated. The plan that assumes everything goes perfectly is the plan that causes the most stress when reality arrives.
This principle is formally known as the Critical Path Method — the standard approach for planning large projects across industries for decades. You don’t need to master the full methodology to apply the core idea immediately. Understand the basics, start using them, and the results will be visible in your next project.
Backplanning doesn’t guarantee a perfect outcome. But it does guarantee you’ve thought through the path before you start walking it — which puts you ahead of most teams before the project even begins.
What’s one project you’re currently working on that you’ve planned forward rather than backwards, and what constraint might you be missing as a result?
You might also enjoy:
How to set goals that actually drive results
Why weekly planning beats daily planning
Get practical ideas every Thursday
Join hundreds of leaders who lead and live with greater clarity and focus on what matters.
No spam. Unsubscribe anytime.